工地木工加工棚定制注意事項(xiàng)
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來定。
In general, the steel bar processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the steel bars. At the same time, double-layer hard protection must be set up, and the specific size of the shed should be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,.上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 毫米。
The top of the protective shed has two layers. The upper layer is covered with a template, and the lower layer is covered with two layers of bamboo strips, with a spacing of 500 millimeters between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語(yǔ)的橫幅,圖牌的尺寸為:寬×高=2000毫米×1000毫米,橫幅寬度宜為1米。
3. The tool type steel bar processing shed needs to hang operating procedure signs and safety propaganda slogans in prominent places. The size of the sign is: width x height=2000 mm x 1000 mm, and the width of the banner should be 1 meter.
4.加工車間地面需硬化,宜選用砼地面。
4. The floor of the processing workshop needs to be hardened, and concrete floor should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, steel processing equipment, and lighting systems inside
6.加工車間地面需硬化,宜選用砼地面。
6. The floor of the processing workshop needs to be hardened, and concrete floor should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In the southern region, if encountering a typhoon, windproof measures should be taken and cable wind ropes can be installed.
以上就是有關(guān):木工加工棚 的介紹,想了解更多的內(nèi)容請(qǐng)點(diǎn)擊:http://www.davylee.cn 我們將會(huì)全心全意為您提供滿分服務(wù),歡迎您的來電!
The above is an introduction to the woodworking processing shed. To learn more, please click: http://www.davylee.cn We will wholeheartedly provide you with full score service. Welcome to call us!